Option 1 - To add data to the database, based on time

Option 1

Once the properties are added, click 'Create schedule'.

Add Schedule properties and click 'Create schedule.'

  • Click on the 'CRON expressions' link to learn more about CRON syntax for assigning a required schedule.

Click the 'Run' tab and then click 'Run job' to manually run the job; the database will be populated if the parquet files are already available in S3.

Note:

  • The database will be populated only if the parquet files are already available in S3; otherwise, there is no need to run the job manually.

The run screen then displays the active status of the job.

The job is successfully scheduled.

The database details, along with the logger number, are displayed.

Note:

  • Happens only when the job is run manually after creation it will have to wait until the first run.

Click on the logger serial number to get a detailed report.

Setting a Grefana Dashboard using the Athena plugin

Last updated