Option 1
Once the properties are added, click 'Create schedule'.
Add Schedule properties and click 'Create schedule.'
Click the 'Run' tab and then click 'Run job' to manually run the job; the database will be populated if the parquet files are already available in S3.
The run screen then displays the active status of the job.
The job is successfully scheduled.
The database details, along with the logger number, are displayed.
Click on the logger serial number to get a detailed report.